Field notes on VMware decisions.
Practical writing for IT leaders making VMware decisions and the engineers who carry them out.
Licensing and renewals
How per-core licensing, order minimums, and renewal timing shape what you pay, and what to check before you sign.
Paired with: VMware Renewal Prep Checklist
-
Consolidating Hosts Before a VMware Renewal: The Memory Math Everyone Skips
Fewer, denser CPUs cut licensed cores. They don't cut the memory your VMs use, and a consolidation plan sized on cores alone can land at 98%.
-
Counting Licensed VMware Cores From an RVTools Export in 15 Minutes
Three columns on one tab, one formula, and a short list of hosts people forget. Enough to check a renewal quote before the call.
-
VCF or vSphere Foundation at Renewal: How to Tell Which One You Need
The edition decision usually gets made by whatever was on the last quote. A short inventory of what you actually run tells you whether that was right.
-
Why Your VMware Renewal Quote Shows More Cores Than Your Servers Have
The quote isn't wrong. Every CPU is billed at a 16-core minimum, and older or smaller CPUs pay for cores that were never there.
VCF 9 upgrades
A VCF 9 upgrade is an architecture and operations decision, not only a version change. Readiness, sequencing, the VCF Installer, organization models, storage, automation, and validation.
Paired with: VCF 9 Upgrade Readiness Checklist
-
Distributed Switch Models in VCF 9: Count the NICs Before You Pick One
The switch model looks like a networking preference. It's a hardware decision wearing a networking name, and it gets made before anything is racked.
-
NSX Edge Sizing and Placement in VCF 9: Where Teams Guess
The Edge size usually gets picked in a hallway. The placement gets picked by whatever cluster had room. Both are hard to undo.
-
Workload Domain Boundaries: When to Add a Domain vs. Add a Cluster
Both add hosts. Only one of them adds a boundary, and that difference is what the rest of the design should be built around.
-
Certificates and Identity in VCF 9: Pick the Model Before You Deploy
Both get settled quickly during bring-up, mostly by defaults, and both come due months later when the person who made the call is on another project.
-
The VCF 9 Management Domain Decisions You Can't Undo After Day 0
Most management domain choices can be revisited later, at a price. A few can't be revisited at all, and they're the ones that get made in the first hour.
-
What I'd Do Differently on a VCF 9 Migration: Lessons From the Field
The plan I'd write today opens with a host inventory, not a maintenance window. Most of what changed has nothing to do with the upgrade itself.
-
Post-Migration Validation: What "It's Upgraded" Doesn't Tell You
The core components coming up clean isn't the same thing as validated. There are two verification sheets, not one, and a licensing reset that shows up 90 days later.
-
NSX-T Through a VCF Migration: What Breaks, What Doesn't, What to Check First
Global and Local Manager can stop trusting each other weeks after a routine cert rotation, with no obvious error pointing at why. That's what "what breaks" actually looks like.
-
Migrating vSAN Into VCF 9: What ESA Changes About Your Upgrade Plan
There's no in-place path from OSA to ESA, VCF 9 requires vLCM images for every vSAN cluster, and the hardware compatibility rules get stricter, not just different.
-
The Bundle Sequencing Trap: Why Your VCF Upgrade Precheck Just Failed
The next bundle isn't broken. It's not visible yet, because SDDC Manager has to upgrade first — and the order underneath the whole flow isn't a suggestion.
-
Cloud Builder Is Dead — What the VCF Installer Actually Changes
It's not a rebrand. VCF Installer enforces its prechecks completely — fail one and the whole run stops, no partial-proceed, no override.
-
The VCF 9 Org Model Decision Nobody Explains Before You Start: VM Apps vs. All Apps
A smooth upgrade quietly auto-maps you into VM Apps. That's fine — until you need Kubernetes, or ServiceNow, or both, and find out a vCenter can only belong to one org type.
-
Is Now the Time to Move From VCF 5.x to VCF 9? A Readiness Checklist
There's no mandatory deadline to move off 5.x. That changes the question from "when do we have to" to "when does it actually make sense" — and the honest answer usually starts with licensing, not technology.
-
Why Your VCF Automation Deployment Probably Isn't Doing What You Think It Is
Most Aria Automation deployments deliver a portal that provisions VMs. The platform is capable of considerably more than that — and the gap between what's deployed and what's actually running is almost always the same set of decisions that got deferred.
-
vSAN ESA vs. OSA — What Changed and What It Means for Your Storage Design
ESA isn't a rename. The disk group is gone, RAID-5 now performs like RAID-1, snapshots are fundamentally different, and in-place upgrade from OSA isn't supported. What that means for your environment depends on hardware you actually have, not the feature list you want to be running on.
-
Day 0 Decisions That Haunt You at Day 180
The architecture choices that feel fine during deployment have a way of turning into very expensive opinions six months later. Three I run into constantly — and why they're so easy to miss at bring-up.
Migration
Moving workloads with HCX and planning moves between platforms, with the dependencies and validation that make a migration hold up after cutover.
Paired with: HCX Migration Type Decision Matrix (coming soon)
-
HCX Migration Types Explained — And How to Actually Pick the Right One
vMotion, Bulk, RAV, OSAM — each exists for a reason and fails in a specific way when misapplied. A plain-language breakdown with the gotchas that don't always make the official documentation's front page.
Resilience and compliance
Segmentation, identity, recovery, and the gap between written controls and production.
-
NSX-T Micro-Segmentation: What It Is, Why It Matters, and Where Teams Get It Wrong
Zero trust as a concept is easy. The Distributed Firewall is how you actually enforce it — and the gap between those two statements is where most implementations either stall or go sideways.
Planning and delivery
How VMware projects are scoped, staffed, and run, and why they fail.
-
Staff Augmentation vs. Managed Service — Knowing Which One You Actually Need
They solve different problems. Picking the wrong one costs time, money, and usually an uncomfortable conversation with whoever approved the spend.
-
What a VCF Managed Support Retainer Should Actually Include
Not all retainers solve the same problem. The difference between one that keeps a VCF environment healthy and one that just answers tickets when something's already broken.
-
The VCF Readiness Assessment: What It Is and Why Skipping It Is Expensive
The failures that derail VCF deployments are predictable. DNS records that weren't created, MTU that wasn't validated, firmware that didn't match the compatibility guide. None of it is exotic — and all of it is findable before bring-up starts.
-
What "Boutique Consulting" Actually Means — And What It Doesn't
Small doesn't mean limited. It means the person who designed your environment is the person answering your call. Here's the actual difference between a boutique practice and a smaller version of a big systems integrator.
-
The Hidden Cost of Junior Staff on a VCF Engagement
Most VCF engagements start with a senior architect in the room. They rarely end that way. Here's how the staffing handoff works, where it breaks down in the environment, and how to recognize it before it becomes your problem to fix.
-
Why VCF Projects Fail — And It's Not the Technology
VMware Cloud Foundation is a mature, capable platform. The projects that go sideways almost always trace back to the same root cause — and it has nothing to do with the software.
Rather talk it through?
A 20-minute call is enough to tell whether an assessment would help, and which one.